G98 vs G99 explained for homeowners
G98 and G99 are grid-connection rules, not solar panel brands or tariffs. The important question is how much generating equipment is connecting to the local electricity network and what process your installer needs to follow.
What matters most.
- G98 is commonly used for compliant small generation up to 16A, about 3.68kW, per phase.
- Systems above that threshold, or systems outside the G98 conditions, generally fall into a G99 connection process.
- A larger panel array does not automatically tell you the connection route; inverter and registered generation capacity matter.
- Export limitation under G100 can sometimes allow larger installed equipment while keeping export within an agreed limit.
What G98 is
Engineering Recommendation G98 covers compliant microgeneration connected in parallel with the public electricity network. For a typical single-phase domestic connection, the familiar threshold is 16A per phase, roughly 3.68kW.
Where the installation meets the G98 conditions, the process is generally simpler than a full G99 application. The installer still has notification and compliance responsibilities.
What G99 is
G99 covers generation and storage installations that sit outside the G98 route, including equipment rated above 16A per phase or systems that do not meet the relevant G98 requirements.
For many domestic systems the DNO application can still be straightforward, but approval may be needed before installation depending on the equipment and connection route.
Why panel count can confuse the issue
A solar array might have more than 3.68kWp of panels while using an inverter whose registered AC capacity is different. Equally, adding a separate AC-coupled battery inverter can change the total generation capacity seen by the network.
That is why a homeowner should not decide 'G98 or G99' from panel count alone. The installer should assess the actual inverter and storage arrangement.
Where export limitation fits
Export limitation is a separate concept. A G100-compliant control scheme can restrict how much power is exported at the grid connection even when more generation or storage is installed behind it.
The DNO still needs to accept the arrangement where required. Export limiting should not be confused with simply changing a setting after installation.
What the homeowner actually needs to ask
You do not need to fill in engineering forms yourself on a normal domestic project. You do need a quotation that makes the connection route clear and an installer that handles the correct DNO process.
Ask whether the proposal is G98 or G99, whether any approval is needed before installation, whether export is being limited and whether adding a battery changes the application.
Questions homeowners usually ask next.
Is G98 limited to 3.68kW?+
For a typical single-phase domestic installation, G98 is commonly associated with the 16A-per-phase threshold, which is about 3.68kW. The exact route still depends on compliant equipment and the installation arrangement.
Can I have more than 3.68kW of solar panels?+
Yes. Domestic systems can be larger, but the inverter arrangement and DNO connection process need to be designed correctly. A larger system may require G99 or an approved export-limited arrangement.
Does adding a battery affect G98 or G99?+
It can. AC-coupled storage has its own inverter and may add to the generation capacity considered by the DNO. A DC-coupled battery behind the same hybrid inverter is treated differently. The installer should assess the complete system.
What is G100 export limitation?+
G100 covers compliant export limitation schemes that control the net power exported through the grid connection. They can be used in some designs where installed generation or storage is larger than the agreed export capacity.