Solar panels, plug-in solar & battery storage for Yorkshire homes Talk to us: 01845 591162
Solar advice/Solar buying guide
Solar buying guide

How to compare solar quotes properly

Two solar quotations can show similar panel counts and still describe very different jobs. Compare the scope line by line before deciding which one is genuinely better value.

Practical UK homeowner guideReviewed 21 October 2026
THE SHORT VERSION

What matters most.

  • Compare expected annual generation and the assumptions behind it, not just panel count.
  • Check the exact panel, inverter and battery models plus usable battery capacity and power.
  • Make sure scaffolding, electrical work, monitoring, DNO work and certification are clearly included or excluded.
  • A cheap quote can become expensive if important parts of the installation are missing from the scope.
01

Start with the system design

The quotation should state the number and model of panels, total array capacity, inverter model and rating, battery model and usable capacity where included, plus the proposed roof layout.

If one quote gives only a panel count and a total price, you do not yet have enough information for a fair comparison.

02

Compare expected generation on the same basis

Annual generation estimates depend on location, orientation, roof pitch, shading and system losses. A higher forecast is not automatically better if it relies on optimistic assumptions.

Ask whether the estimate reflects the actual roof faces and any meaningful shading. For MCS installations, the installer should provide the relevant performance estimate as part of the process.

03

Separate battery capacity from battery power

Usable kWh tells you how much energy can be stored. Charge and discharge kW tells you how quickly the battery can move energy. Backup output may be different again.

When one quotation says '10kWh battery' and another says the same, check whether the usable capacity, power, warranty and expansion rules are genuinely comparable.

04

Check the boring items because they cost money

Scaffolding, roof access, bird protection, cable routes, consumer-unit work, isolators, monitoring, DNO applications, export limitation, commissioning and making good can materially change the final scope.

A good quote should make exclusions obvious rather than leaving them for the installation day.

05

Understand the certification and export route

If you want to apply for a Smart Export Guarantee tariff, the installation normally needs suitable certification. For installations up to 50kW, Ofgem guidance refers to MCS certification or an equivalent route.

The quotation should also be clear about who is the certified installer, who handles the DNO process and what paperwork you receive after commissioning.

06

Look at warranties in layers

Panels, inverter, battery and workmanship can each have different warranty terms. A long panel product or performance warranty does not automatically mean the inverter, battery and installation workmanship are covered for the same period.

Check who you would contact if something fails and whether monitoring or remote diagnostics are included.

07

Compare the outcome, not the sales pitch

The best quote is the one that gives the home a sensible generation profile, suitable storage, a clear route through grid approval and a tidy installation scope at a price that stacks up.

If the more expensive quote includes better access, stronger equipment, backup hardware or electrical work that the cheaper one excludes, the headline difference may not be a like-for-like saving.

COMMON QUESTIONS

Questions homeowners usually ask next.

Should I choose the cheapest solar quote?+

Not automatically. First check that the equipment, generation estimate, scaffolding, electrical work, DNO process, certification, monitoring and exclusions are genuinely comparable.

What paperwork should I receive after solar is installed?+

The exact documents depend on the system, but a properly completed installation should include commissioning and electrical documentation plus the relevant certification and DNO paperwork for the connection route.

Does MCS matter for export payments?+

For Smart Export Guarantee eligibility, Ofgem guidance says installations up to 50kW will be asked to demonstrate suitable certification, normally an MCS certificate or equivalent.

How can I compare two battery quotes?+

Compare usable capacity, charge and discharge power, inverter strategy, backup capability, warranty, monitoring, future expansion and the installed electrical scope, not just the kWh figure.

READY TO TAKE THE NEXT STEP?

Start with the property, not a sales pitch.

Tell us where the home is and roughly how you use electricity. We can move that towards a sensible solar and battery starting point.

Get my instant solar price